Welcome to Jiangsu Fu'an cocoon silk Co., Ltd

Rich Sally dyeing and finishing projects trial production environmental protection approved

Time:2019-12-05 Clicks:450
October 30, 2012, yancheng city environmental protection bureau, yancheng of the environmental supervision bureau of the expert group a line of two people, in dongtai environmental protection bureau deputy director of WangWenBao accompanied down my company, my company rich Sally dyeing and finishing projects prototype application field examination. Expert group a line in the construction project to return, carefully check the eia material, has deep into the sewage treatment center, dyeing and finishing workshop, boiler workshop, solid waste disposal point and pollution monitor control room and carrying out the field inspection, the panel think I company rich Sally dyeing and finishing projects eia report strictly according to the design requirements, high standard construction, the process unit is advanced, anti-pollution blowdown comply with the design requirements, and agree to the project trial production. 
>